| Customer : | CIT BLATON |
| Project : | Thermal desorption treatment of 100 tons of mineral oil-contaminated soil by means of the In-situ Thermopile© process. |
Problem to solve:
CIT Blaton the main contractor was faced with a TPH contamination on the -3 floor, due to a leaking fuel tank. This urban contamination could only be solved by the In-situ Thermopile© treatment because the excavations were forbidden. So, Deep Green was chosen to treat the site.
Cleaning objective:
The decontamination target was 800 mg/kg.
Deep Green solution:
The treatment was carried out In-situ.
Results:
The decontamination target of 800 mg/kg was achieved; we were even better. Indeed, the average TPH concentrations were below 10 mg/kg.