animation

references Thermal desorption

In-situ configuration:

In-situ treatment on the Delta site, Brussels – Belgium In-situ treatment on the Delta site, Brussels – Belgium
Thermal desorption treatment of 3,000m³ of mineral oil-contaminated soil by means
of the In-situ Thermopile© process.
In-situ treatment in the Malta embassy, Brussels - Belgium
Thermal desorption treatment of 100 tons of mineral oil-contaminated soil by means of the In-situ Thermopile© process.
   

Pile configuration:

ARCELOR - MITTAL  THERMOPILE

On-site treatment on Neuves-Maisons' site for ARCELOR-MITTAL - France
Thermal desorption treatment of 2000 tons of PAH contaminated soil by means of the on-site Thermopile© process

Chertal

On-site Thermopile© treatment on a flat steel production plant - Belgium
Thermal desorption treatment of 100 tons of mineral oil-contaminated iron waste by means of an on-site Thermopile© process.